Birchenough Bridge

Birchenough Bridge opened 20th December 1935
The Birchenough Bridge opened 20th December 1935

 

The BIRCHENOUGH  BRIDGE

The magnificent bridge spanning the Sabi River, a gift to the Public of Southern Rhodesia from the funds of the Beit Trust was, at the request of the people of Rhodesia, named “THE BIRCHENOUGH BRIDGE” in recognition of the services given to the country by Sir Henry Birchenough, Bart., G.C.M.G., the Chairman of the Beit Railway Trust and President of the British South Africa Company. Portraits  in bronze of Sir Henry Birchenough, by Mr. Sydney Kendrick, and inscription panels in bronze have been inserted in the east and west abutments.

Facsimile of portrait in bronze of Sir Henry Birchenough by Sydney Kendrick which appears in the east and west abutments.
Facsimile of portrait in bronze of Sir Henry Birchenough by Sydney Kendrick which appears in the east and west abutments.
Facsimile of inscription panel in bronze inserted in the east and west abutments.
Facsimile of inscription panel in bronze inserted in the east and west abutments.

The bridge was built to give the people residing in the eastern districts access across the Sabi River to the central districts of Southern Rhodesia.  In addition, the bridge will serve to open up to visitors from the Union of South Africa and elsewhere one of the most beautiful mountain districts in the territory.

The bridge crosses the Sabi River with a single arch which rises to 280 feet above the river, and is 1,080 feet in length, a span which is exceeded by only two other arch spans:- the great  bridge crossing Sydney Harbour, and the Bayonne Bridge over the Kill van Kull Creek, south of New York.

The Birchenough Bridge was designed by Mr. Ralph Freeman, consulting engineer to the Beit Trust, who also designed the Sydney Harbour Bridge and the Beit Bridge over the Limpopo River.

The bridge is the first long-span bridge to be con­structed in the British Empire with modern high tensile steel.  With trifling exception, the whole structure is made of Dorman Long & Company’s “Chromador ” steel – a material possessing a strength 50 per cent. greater than that of the mild steel generally used for bridgework and 20 per cent. stronger than the silicon steel used for Sydney Bridge. The use of this material made it possible to construct the bridge at a moderate cost as a single span.  This avoided the necessity for making piers in the river bed which was found to be of a shifting and treacherous character.  Even if the river bed had been normally stable, the type of bridge adopted, which was selected by the Trustees after full consideration of possible alternatives, was found to be the least costly.

The roadway has a width of 18 feet and is designed for heavy-type Colonial loading.  Footways are formed on either side of the road so as to allow for the uninterrupted passage of two lines of traffic.

The total weight of steel is 1,500 tons and it is noteworthy that this is the same weight as that of the Victoria Falls Bridge designed originally for two lines of light railway traffic, but of less than half the   span of the Birchenough Bridge.

In the combination which the design provides of an exceptional span with light weight and small capital outlay, the arch span is unique in bridge construction.

The bridge was erected by the same process as that used for the Victoria Falls Arch and subsequently for the Sydney arch – by building out the arch in two halves as cantilevers, anchored back to the   rock shores by wire ropes.  The anchorage ropes used were the actual ropes used for the Sydney Harbour Bridge and are now incorporated in the Birchenough Bridge as the suspenders of the roadway.

Material was delivered to the west bank of the river by road and the rapid and completely successful transport of the heavy and cumbrous pieces of material under  conditions of exceptional difficulty, was  an achievement for which great credit is due to the Rhodesia Railways Road Transport organisation and to the Roads Department of the Govern­ment of Southern Rhodesia.  The steelwork for the east side was carried across the river by a cableway.

Foundations were commenced in April 1934 and were ready for steelwork in November.  The arch span was completed on June 17th, 1935, and the concrete roadway was practically complete at the end  of September, 1935.

The only work  then remaining was unimportant auxiliary construction and  painting.  The whole of the works were finished so as to enable the bridge to be opened to traffic on December 20th, 1935, the time occupied by the entire construction being 20 months.

The contractors for the supply of steel, manufacture of steelwork, and erection, were Dorman Long & Company, Limited, of Middlesbrough, England, whose previous experience, as the builders of the  Sydney Harbour Bridge, and the arch bridge, of 530 feet span over the Tyne, Newcastle, was of great value.

 

A photographic timeline of the construction of the Birchenough Bridge

Bridge Site. Sabi River before work was commenced. April, 1934.
Bridge Site. Sabi River before work was commenced. April, 1934.
East Bank. Excavation work started on the skewback foundations. May, 1934.
East Bank. Excavation work started on the skewback foundations. May, 1934.
East Bank. Concrete work commenced at the south-east skewback. August, 1934.
East Bank. Concrete work commenced at the south-east skewback. August, 1934.

 

 

 

Bearings in position ready to be concreted. September, 1934.
Bearings in position ready to be concreted. September, 1934.
East Bank. Skewbacks and bearings completed. October, 1934.
East Bank. Skewbacks and bearings completed. October, 1934.
East Bank. Erection of temporary ramp on which creeper cane was erected for travelling up on to the arch. November, 1934.
East Bank. Erection of temporary ramp on which creeper cane was erected for travelling up on to the arch. November, 1934.
Blondin mast and traveller ready to convey bridge material across the river. November, 1934
Blondin mast and traveller ready to convey bridge material across the river. November, 1934
East Bank. Commencement of erection of steel-work. December, 1934.
East Bank. Commencement of erection of steel-work. December, 1934.
West Bank. View of completed skewbacks and bearings with temporary ramp for creeper crane. January, 1935.
West Bank. View of completed skewbacks and bearings with temporary ramp for creeper crane. January, 1935.
East Bank. First panel completed with crane on top chord. January, 1935.
East Bank. First panel completed with crane on top chord. January, 1935.

 

 

 

Driving the first rivet. 22nd January, 1935.
Driving the first rivet. 22nd January, 1935.
West Bank. First panel completed. January, 1935.
West Bank. First panel completed. January, 1935.

 

 

 

Position of steelwork of arch at end of February, 1935.
Position of steelwork of arch at end of February, 1935.
Position of steelwork of arch at end of March, 1935.
Position of steelwork of arch at end of March, 1935.
West Bank. Position of half-arch, end of April, 1935.
West Bank. Position of half-arch, end of April, 1935.
Position of arch, early in June, 1935.
Position of arch, early in June, 1935.
Closure of arch, early morning of 17th June, 1935.
Closure of arch, early morning of 17th June, 1935.
Arch completed,. July, 1935.
Arch completed,. July, 1935.
View of arch from west to east. Deck in process of construction. Middle of July, 1935
View of arch from west to east. Deck in process of construction. Middle of July, 1935
West Bank. View of arch from west to east showing completed steelwork of deck and approach span.
West Bank. View of arch from west to east showing completed steelwork of deck and approach span.
View of deck looking east. Placing reinforcement in concrete roadway in the foreground. August, 1935.
View of deck looking east. Placing reinforcement in concrete roadway in the foreground. August, 1935.
View of bridge approaching from Umtali. August, 1935.
View of bridge approaching from Umtali. August, 1935.
View of Bridge. North side looking west. Creeper crane being dismantled. August, 1935.
View of Bridge. North side looking west. Creeper crane being dismantled. August, 1935.
General view of roadway under construction. September, 1935.
General view of roadway under construction. September, 1935.
General view of completed bridge with approach spans and abutments. December, 1935.
General view of completed bridge with approach spans and abutments. December, 1935.

 

A detailed account of the bridge and its construction.

Click below

Wonders of World Engineering - Birchenough Bridge
Wonders of World Engineering – Birchenough Bridge

 

View from the bridge

Birchenough Bridge over a dry Sabi River in a very dry season.
Birchenough Bridge over a dry Sabi River in a very dry season.

.

A final view of a great achievement.

Birchenough Bridge from the air looking east
Birchenough Bridge from the air looking east